Bao Lam 3 Hydropower Project
15/07/2018
Bao Lam 3 Hydropower Project is owned by the No. 1 Electricity Construction Joint Stock Company (PCC1) with a total investment budget of 2000 billion VND, total capacity of 46MW and an annual power output of 192.175 million kWh. The project was constructed on Nho Que River, located in Duc Hanh commune, Bao Lam district, Cao Bang province, and in Niem Tong commune, Meo Vac district, Ha Giang province. The project construction is expected to be completed within 2 years and will generate power to the national grid by the end of 2017.
The project contract of manufacturing, transportation and installation for hydro-technical mechanical equipment is being implemented by Machinery Industrial and Equipment Corporation (MIE). Contract value is more than 28 billion VND.
ORTHER NEWS
- › Bao Lam 3A Hydropower project (05/07/2018)
- › Lai Chau Hydropower Project (02/06/2017)
- › Pa Chien hydropower project (02/06/2017)
- › Expansion of sulfuric acid production lines for Tan Binh chemical factory (02/06/2017)
- › Na Tau Hydropower Plant (02/06/2017)
- › Project of Tanks for H2O2 - 500 m3 - Hung Pha Ha Bac JSC (02/06/2017)
- › Supply and installation for OПB10 -145 circulation pump - Pha Lai Thermoelectric Joint Stock Company (02/06/2017)
- › Project of Upgrading for DCS system - Ha Bac Fertilizer Co.,ltd (02/06/2017)
- › Hong Phong Cement Plant - Lang Son Province (02/06/2017)
- › Manufacture of pipeline system hfo pipe supporting rack for project of Pha Lai 2 thermoelectric plant (02/06/2017)
- › Cao Ngan thermoelectric plant - Thai Nguyen (02/06/2017)
- › Manufacture supply of equipment for project of Ba Ria 2 steam stern plant (02/06/2017)
- › Manufacture assembly of equipment for casting line of 6000 ton year (02/06/2017)
- › Supply of equipment for Lam Son sugar factory- Thanh Hoa (02/06/2017)
- › Manufacture of coal feeding funnel for Pha Lai 2 thermoelectric plant (02/06/2017)