Manufacture assembly of equipment for casting line of 6000 ton year
02/06/2017
In 2001, MIE has fabricated and installed a casting line of 6,000 tons per year for FOUNDRY CHEMICAL SYSTEMS PACIFIC RIM Co.,ltd. Total contract value is more than $ 750,000.
ORTHER NEWS
- › Bao Lam 3 Hydropower Project (15/07/2018)
- › Bao Lam 3A Hydropower project (05/07/2018)
- › Lai Chau Hydropower Project (02/06/2017)
- › Pa Chien hydropower project (02/06/2017)
- › Expansion of sulfuric acid production lines for Tan Binh chemical factory (02/06/2017)
- › Na Tau Hydropower Plant (02/06/2017)
- › Project of Tanks for H2O2 - 500 m3 - Hung Pha Ha Bac JSC (02/06/2017)
- › Supply and installation for OПB10 -145 circulation pump - Pha Lai Thermoelectric Joint Stock Company (02/06/2017)
- › Project of Upgrading for DCS system - Ha Bac Fertilizer Co.,ltd (02/06/2017)
- › Hong Phong Cement Plant - Lang Son Province (02/06/2017)
- › Manufacture of pipeline system hfo pipe supporting rack for project of Pha Lai 2 thermoelectric plant (02/06/2017)
- › Cao Ngan thermoelectric plant - Thai Nguyen (02/06/2017)
- › Manufacture supply of equipment for project of Ba Ria 2 steam stern plant (02/06/2017)
- › Supply of equipment for Lam Son sugar factory- Thanh Hoa (02/06/2017)
- › Manufacture of coal feeding funnel for Pha Lai 2 thermoelectric plant (02/06/2017)