Bao Lam 1 Hydropower project is owned by No. 1 Electricity Construction Joint Stock Company (PCC1) with total investment budget of 980 billion VND. Itt has a total capacity of 30 MW, with an annual power output of 115.7 million kWh. The project was constructed on Nho Que River, located in Duc Ly Bon Commune, Bao Lam District, Cao Bang Province. It was started for construction in 2014 and expectedly to generate power to the national grid by the end of 2016.
The contract for fabrication and transporting of spillway gate of Bao Lam 1 Hydropower Project is being implemented by MIE with total contract value of more than 20 billion VND.
ORTHER NEWS
- › Bao Lam 3 Hydropower Project (15/07/2018)
- › Bao Lam 3A Hydropower project (05/07/2018)
- › Lai Chau Hydropower Project (02/06/2017)
- › Pa Chien hydropower project (02/06/2017)
- › Expansion of sulfuric acid production lines for Tan Binh chemical factory (02/06/2017)
- › Na Tau Hydropower Plant (02/06/2017)
- › Project of Tanks for H2O2 - 500 m3 - Hung Pha Ha Bac JSC (02/06/2017)
- › Supply and installation for OПB10 -145 circulation pump - Pha Lai Thermoelectric Joint Stock Company (02/06/2017)
- › Project of Upgrading for DCS system - Ha Bac Fertilizer Co.,ltd (02/06/2017)
- › Hong Phong Cement Plant - Lang Son Province (02/06/2017)
- › Manufacture of pipeline system hfo pipe supporting rack for project of Pha Lai 2 thermoelectric plant (02/06/2017)
- › Cao Ngan thermoelectric plant - Thai Nguyen (02/06/2017)
- › Manufacture supply of equipment for project of Ba Ria 2 steam stern plant (02/06/2017)
- › Manufacture assembly of equipment for casting line of 6000 ton year (02/06/2017)
- › Supply of equipment for Lam Son sugar factory- Thanh Hoa (02/06/2017)