Buon Kuop Hydropower Plant, Dak Lak Province
02/06/2017
Buon Kuop Hydropower Plant is a project of Dak Lak Province, being constructed on the Serepôk River. It is located in the communes of Hoa Phu (Cu Jut district), Nam Da (Krong No district) and Ea Na (Krong Ana district).
The installed capacity is 280 MW, the average annual power output is 825 million KWh, with total investment budget is 4616 billion VND.
Machinery and Industrial Equipment Corporation is leader of joint venture of MIE-NARIME-VINAINCON supplying of hydraulic equipment of Package no. 26.
ORTHER NEWS
- › Bao Lam 3 Hydropower Project (15/07/2018)
- › Bao Lam 3A Hydropower project (05/07/2018)
- › Lai Chau Hydropower Project (02/06/2017)
- › Pa Chien hydropower project (02/06/2017)
- › Expansion of sulfuric acid production lines for Tan Binh chemical factory (02/06/2017)
- › Na Tau Hydropower Plant (02/06/2017)
- › Project of Tanks for H2O2 - 500 m3 - Hung Pha Ha Bac JSC (02/06/2017)
- › Supply and installation for OПB10 -145 circulation pump - Pha Lai Thermoelectric Joint Stock Company (02/06/2017)
- › Project of Upgrading for DCS system - Ha Bac Fertilizer Co.,ltd (02/06/2017)
- › Hong Phong Cement Plant - Lang Son Province (02/06/2017)
- › Manufacture of pipeline system hfo pipe supporting rack for project of Pha Lai 2 thermoelectric plant (02/06/2017)
- › Cao Ngan thermoelectric plant - Thai Nguyen (02/06/2017)
- › Manufacture supply of equipment for project of Ba Ria 2 steam stern plant (02/06/2017)
- › Manufacture assembly of equipment for casting line of 6000 ton year (02/06/2017)
- › Supply of equipment for Lam Son sugar factory- Thanh Hoa (02/06/2017)