Nhan Hac Hydropower project
20/05/2017
.jpg)
Nhan Hac Hydropower project is owned by Za Hung Joint Stock Company with total investment budget of 1881 billion VND. This plant has capacity of 59MW, with power output of 220 million KWh/year and was constructed in Que Son commune, Que Phong district, Nghe An province. It was started for construction in January 2015 and expectedly to be completed in the third quarter of 2018.
On August 25th, 2016, the contract for supply and installation of pressure pipeline for Nhan Hac Hydropower project was signed by Project Owner and Machinery Industrial and Equipment Corporation (MIE) with contract value of more than 37 billion VND, the contract is expectedly completion in December 2017.
ORTHER NEWS
- › Bao Lam 3 Hydropower Project (15/07/2018)
- › Bao Lam 3A Hydropower project (05/07/2018)
- › Lai Chau Hydropower Project (02/06/2017)
- › Pa Chien hydropower project (02/06/2017)
- › Expansion of sulfuric acid production lines for Tan Binh chemical factory (02/06/2017)
- › Na Tau Hydropower Plant (02/06/2017)
- › Project of Tanks for H2O2 - 500 m3 - Hung Pha Ha Bac JSC (02/06/2017)
- › Supply and installation for OПB10 -145 circulation pump - Pha Lai Thermoelectric Joint Stock Company (02/06/2017)
- › Project of Upgrading for DCS system - Ha Bac Fertilizer Co.,ltd (02/06/2017)
- › Hong Phong Cement Plant - Lang Son Province (02/06/2017)
- › Manufacture of pipeline system hfo pipe supporting rack for project of Pha Lai 2 thermoelectric plant (02/06/2017)
- › Cao Ngan thermoelectric plant - Thai Nguyen (02/06/2017)
- › Manufacture supply of equipment for project of Ba Ria 2 steam stern plant (02/06/2017)
- › Manufacture assembly of equipment for casting line of 6000 ton year (02/06/2017)
- › Supply of equipment for Lam Son sugar factory- Thanh Hoa (02/06/2017)