Pleikrong Hydropower Plant, Kon Tum Province
02/06/2017

Pleikrong Hydropower Plant is constructed in Kon Tum Province, on the major tributary of Krong Pôk River, belonging to the upperstream part of Se San River. The whole items of this project is located in Sa Binh commune, Sa Thay district and in Kroong commune, Kontum town.
The factory has installed power of 100 MW with 2 generator units, the average power output is 417.2 million KWh, total investment budget is 3494 billion VND.
Machinery and Industrial Equipment Corporation is the joint-name representative of MIE-NARIME-VINAINCON supplying of hydraulic equipment for Package no.3.
- Commencement time: November 23rd, 2003.
- The first machine unit connecting to the national grid on: May 12th, 2009.
- Officially commercial power generation on May 24th, 2009.
ORTHER NEWS
- › Bao Lam 3 Hydropower Project (15/07/2018)
- › Bao Lam 3A Hydropower project (05/07/2018)
- › Lai Chau Hydropower Project (02/06/2017)
- › Pa Chien hydropower project (02/06/2017)
- › Expansion of sulfuric acid production lines for Tan Binh chemical factory (02/06/2017)
- › Na Tau Hydropower Plant (02/06/2017)
- › Project of Tanks for H2O2 - 500 m3 - Hung Pha Ha Bac JSC (02/06/2017)
- › Supply and installation for OПB10 -145 circulation pump - Pha Lai Thermoelectric Joint Stock Company (02/06/2017)
- › Project of Upgrading for DCS system - Ha Bac Fertilizer Co.,ltd (02/06/2017)
- › Hong Phong Cement Plant - Lang Son Province (02/06/2017)
- › Manufacture of pipeline system hfo pipe supporting rack for project of Pha Lai 2 thermoelectric plant (02/06/2017)
- › Cao Ngan thermoelectric plant - Thai Nguyen (02/06/2017)
- › Manufacture supply of equipment for project of Ba Ria 2 steam stern plant (02/06/2017)
- › Manufacture assembly of equipment for casting line of 6000 ton year (02/06/2017)
- › Supply of equipment for Lam Son sugar factory- Thanh Hoa (02/06/2017)